Current Jobs out for Bid!

Note: Please enter your Search Terms as needed.

Search Zip: Radius: State: Search  
Project Info
Audeo Charter School, WSM - San Diego , CA 92108 - Bids Due: 04/03/2018 01:00 PM
Project consists of work to one existing building, including demolition and improvements to accommodate functional requirements. Scope includes but is not limited to selective demolition, structural improvements, temporary shoring, limited exterior envelope work, new floor plan layouts, new ceilings, new lighting, new mechanical, plumbing, and electrical systems, and other improvements as indicated. Scope also includes interior and exterior accessibility improvements required to comply with the 2010 ADA Standards for Accessible Design of the 2013 California Building Code. Prevailing Wage; PSA DVBE Subs, please provide Certification at time of bid SDVOB Subs, please provide Verification Letter day at time of bid PRE-QUALIFICATION OF BIDDERS: Pursuant to Public Contract Code (PCC) §20111.6, any subcontractor performing the license classifications of A, B [if performing the work of] C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and/or C-46 wishing to submit a bid to a bidding prime contractor must be prequalified in order to bid. Projects estimated at 10 million or greater require audited financials. Contact Glenda Burbery at to request a pre-qualification questionnaire. Completed questionnaires must be submitted to the District no later than 10 BUSINESS DAYS before the bid opening due date. Any questionnaires submitted later than this deadline will not be processed for this Invitation for Bids. The District encourages all general contractors bidding as a prime contractor, and all MEP subcontractors to request a questionnaire, complete it and submit it as soon as possible.
SBIRS Operations Facility, Buckley AFB - , CO - Bids Due: 03/26/2018 01:00 PM
Basis of Design and Bid Documents to follow the week of March 12th. Please have your bids to Straub Construction by 1pm Mountain Standard Time. The bid will be delivered Central Standard Time to Omaha, NE. Project Description is as follows: Design and construct a 61,515 square foot administrative facility including administrative spaces, classrooms, and secure spaces constructed to ICD 705 standards. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, cable TV, intrusion detection, closed circuit surveillance, and electronic access control systems. The project will include the construction of a 1,400 square foot generator facility and significant power and communications infrastructure work. Supporting facilities include demolition of 40,150 square feet of existing facilities, site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, sidewalks, storm drainage, landscaping, and other site improvements.
Moffett Building 19 Tenant Improvements - Moffett Field, CA 94035 - Bids Due: 03/23/2018 12:00 PM
***Amendment 1 has been released - Bid date is now MARCH 23, 2018 at 12pm psd*** Project includes tenant improvement on the 2nd floor of Building 19 and portions of the basement. Includes demolition, new offices and associated support spaces with new mechanical system, plumbing and electrical/data distribution.
Virtual Warfare Ops Nellis AFB, Nevada - , NV - Bids Due: 03/22/2018 02:00
Please complete the NDA in the Documents and return to All bids to be sent to This project is for the design and construction of a facility which will be the hub for connecting, controlling and integrating multiple simulator types co-located at Nellis AFB as well as geographically separated simulators. Th VWC-N Ops Center will house multiple simulators to include F-15C, F-15E, AWACS, man-in-the-loop Adversary Air, Tactical Command & Control (C2), potential additional F-35 and F-22 sims, and follow-on potential for Navy sims (F-18, E-2D, AEGIS), bomber sims, Remotely Piloted Aircraft (RPA) sims, as well as Cyber and Space simulator workstations.
Grossmont College Phase 1 31S Math, and Career Tech Complex - El Cajon, CA 92020 - Bids Due: 3/16/2018 02:00 PM
Project will include the interior, exterior demolition, remodel and seismic upgrade to the structural system of the existing 17, 200 square feet single story classroom building. The building will be comprised of classrooms, labs and offices. DVBE goal of 3% Prevailing Wage; PLA
P-602 Aircraft Maintenance Facility & Apron South Combat Aircraft Loading Area - Yuma, AZ 85365 - Bids Due: 03/15/2018 09:00 AM
*****Amendment 10 has been released*****Send bids in by 9am psd March 15th 2018***** This project includes constructing an Aircraft Maintenance Facility consisting of four bays and supporting shops;an aircraft maintenance apron to support the adjacent South loading area; the expansion of water, sewer, electrical, and communication utilities;roadway; a wash rack; security fencing.The project is designed to meet ATFP requirements. This is new construction and all trades are needed. Project Duration: 745 calendar days. Please be sure to review the bid form for Bid Options pricing and submit your cost proposal accordingly. As stated in the project specifications: No bidder may withdraw their bid for a period of (90) calendar days after the opening of bids. If you will not be bidding this project please select the decline button and you will receive no further communications on this project.

Contact Information

  • 202 West College Street
    Fallbrook, CA 92028
    Phone: 760.414.9000
    Fax: 760.414.9100
    Send Us an Email


  • CA 506797 | NV 46120
    AZ 164996 | NM 365927
    Accredited Quality Contractor (AQC)

Stay Connected

© 2013 Straub Construction, Inc. - All Rights Reserved

Plan Room Powered By:Pantera Tools